We watched a heavy moving company move these two huge boilers (each weighting 468,900 lbs) from the factory to the Welland canal. The Candian Hydro and St. Catharines Police were with them every step of the way.
Yelling Ho and Stop; lifting electic cables out of the way and rotating stop lights on their poles. We started seeing them at 9am; and by 12pm they were only a fourth of the way. The destination was below Lock 1 on the freighter Beluga Projects. Then to Wando, South Carolina for some river project that they were built for.
Yelling Ho and Stop; lifting electic cables out of the way and rotating stop lights on their poles. We started seeing them at 9am; and by 12pm they were only a fourth of the way. The destination was below Lock 1 on the freighter Beluga Projects. Then to Wando, South Carolina for some river project that they were built for.